Answer / Solution |
 |

Default Turn Around Time for Jobs With Unspecified Document Type Explained
Overview
Administrators may specify the Turn Around Time for jobs which are dictated without a document type being specified. These jobs would be shown as "System-Generic" for the document type.
Steps
- Log in to the IMC.
- Go to the Administrative tab, Account sub-tab.
- Scroll down to the Transcription section.
- Set the option for "Turn Around Time for Unspecified Document Type".
- Default setting is 0 minutes.
- Click on Update Account to save the settings.
.jpg) |
Related KBs |
 |
 |
How is the default Document Type set for an Author? Set a default work type for an Author |
 |
What is new on the InfraWare 360 platform? List of new features on the InfraWare 360 Platform |
Last Updated |
 |
Friday, September 12, 2014 |